Landfill gas power plant to set up in Jordan
Supply and installation of inlet CSV, buried gas pipes and gas pipes above ground, LFG interconnection with the existing Power Plant and the condensate removal network. Skid-mounted gas blower for 900 Nm3/h and pressure range -150 / +200 mbar. Necessary accessory elements. According to the attached RFP.
Importer Files (3)
Document_1.pdf
PDF
Document_2.pdf
PDF
Document_3.pdf
PDF
Categories
Keywords
plant
landfill gas power plant
power plant
landfill gas networ
lfg conditioning system
power generation unit
fire protection system
electrical installation
lfg control system