Hardwood dust burner required for Indonesia
We are currently working on a combine heat and power tender for an MDF plant in Indonesia.
The plant waste consist of hardwoods sander dust and trimming dust worth in total to 6500kW of energy.
The waste fuel we intend to feed to power boiler utilizing a dust burner.
As this is an existing plant, the fuel will be delivered at discharge of auger below stock silo
where we will then transfer the fuel by pneumatic conveying system to the burner which will be mounted to the boiler’s furnace f
Categories
Keywords
Hardwood dust burner
required
Indonesia
buy
import
purchase
inquiry
request