Back to list
Import Status: Active For VIP Members
Jordan
15 June 2023 Views: 77

Gas transmission pipeline importing Jordan

The scope of work covers all the detailed engineering for
the entire project, procurement and construction, commissioning and start-up of the
gas pipeline system extending from the designated tie-in with the 36" existing Jordan
Gas Transmission Pipeline to the fiscal metering at the end user site. The
project mainly consists of engineering, procurement and construction of metering
station, pipelines, valves, electrical system, communication system, control system,
utilities system, building system and other matching facilities for the pipeline system.
The Applicants will be evaluated in the following three major areas:
Project and Technical Capability
Health, Safety and Environment (HSE) and Quality Systems
Company Information.

Importer Files (1)
Members Only
to unlock files
Keywords
pipe pipeline gas pipeline gas transmission pipeline spur line
Members Only
Login to view full contact information
Contact Information
Contact Person
Name Surname
Phone
+90 111 222 33 44
Website
examplesite.com
Address
*** *** ***
Country
Country