Bottle And Glass Industry Turn Key Project
General basic requirements.
1. although the plant is to be designed for an output of 60 tons/day molten glass for the first campaign lay-outs of equipment and machinery shall be designed in consideration of future capacity expansion of the plant by at least twice of the same capacity.
machinery and equipment common to both technological capacities shall be provided with adequate capacity right from the beginning.
2. all machinery and equipment should be of the simplest possible, trouble free
Categories
Keywords
Bottle And Glass Industry Turn Key Project